SUMMARY:
  N/A  
TBD  
TBD  
TBD  
TBD  
TBD  
  TBD ESTIMATE
  TOTAL   $ TBD  

TOTAL LAND Section I   N/A  

HOUSE Section II
BASE TBD
EXPAND LENGTH
EXPAND WIDTH
TRANSPORTATION INCL
CRANE & SET INCL
SALES TAX INCL
SUB TOTAL $TBD
GARAGE   TBA
DORMERS
UPGRADES IN HOUSE ( MODULAR)
see upgrade sheet ????
Wind Sheer Bldg Code Requiremts  
APPLIANCES see appliances sheet   ALLOWANCE
         
TOTAL HOUSE Section II   $TBD  
** Note - sales tax, as stated in base price for base modular.

FOUNDATION ELEMENTS Section III   GARAGE
FOOTINGS: 10"x20" FOOTINGS:
PIERS: PIERS:
WALLS: 10" WALLS:
SLAB: 4" SLAB:
WATERPROOF
WINDOWS steel frames
REINFORCING STEEL if applicable
TIES
BOLTS
moisture barrier under slab POLY
to minimize cracks EXPANSION JOINTS
ENGINEER N/A
BILKO DOOR
LALLY COLS
perimeter of foundation wall SILL
TOTAL FOUNDATION SECTION III   $TBD  

SITE ELEMENTS SECTION IV
WATER Site Well or Town/City Water TBD
SEPTIC On Site or Town/City Sewer TBD
DEMOLITION TBD
CONCRETE PUMPER   TBD
SITE WORK
LAND CLEARING INCL
STOCKPILE TOP SOIL INCL
TRACKING PAD INCL
FOUNDATION EXCAVATION INCL
BASEMT FLOOR PREP INCL
FOOTING DRAINS INCL
STONE UNDER FLOOR INCL
BASE -75 Linear Ft DRIVEWAY -1' BANK RUN INCL NOT PAVED
MOVE MODULES N/A
RESPREAD TOP SOIL INCL
BASE SITE WORK TBD
TREE REMOVAL TBD
RAKE, SEED & HAY TBD
RETAINING WALLS TBD
PAVING driveway apron TBD
PAVING driveway/other TBD
PATIOS TBD
WALKWAYS TBD
CURTAIN DRAINS TBD
SITE ELECTRICAL TBD
TOTAL SITE Section IV   $TBD  

BUTTON UP/
HSE COMPL
Section V
BUTTON-UP ELEMENTS Work occurs after house is set on foundation
HARDWOOD FLOORS TBD # floors??
STAIR RAILIING Type TBD
TILE ALLOWANCE
GRANITE KIT. COUNTERS Corian...Granite ALLOWANCE
CARPENTRY TBD
SIDING Vinyl
Hardi Plank  
Cedar  
Trim  
DECKS Pressure Treated TBD  
Fireplace Chimney Completion TBD
PLUMBING inside TBD  
PLUMBING outside connect TBD  
Hydro or Forced Air? HEATING HVAC TBD  
ELECTRICAL TBD
DUMPSTER TBD
CLEANING TBD
BASMT CEILING INSULATION TBD
CARPET seaming TBD
Gutters/Leaders TBD
SHEETROCK & PAINT TBD
LALLY COLS TBD
BSMT STAIR TBD
GENERAL CONDITIONS TBD
GARAGE TBD
O/H Doors TBD
2 OPENERS   TBD
Bonus Room   TBD
Base Handrails Incl
No Paint, No Stain
TOTAL BUTTON-UP Section V   $TBD  

ALLOWANCES  Section VI 
Entrance TBD FRONT STEPS
Kit Counter Granite/ Corian TBD
Bathrooms Tile TBD
Appliances TBD
TOTAL ALLOWANCES  Section VI   $TBD  

MUNICIPAL Section VII
  Building Permit TBD ESTIMATE
  Zoning Permit TBD ESTIMATE
  Sewer & Water TBD
  Police modular moves TBD
TOTAL MUNICIPAL  Section VII   $TBD ESTIMATE

SURVEYING AND ANY ENGINEERING COSTS - NOT INCLUDED.

MUNICIPAL COSTS SUCH AS BUILDING PERMITS, ZONING PERMITS ARE NOT INCLUDED AT THIS TIME.

ADDITIONALLY, MUNICIPAL COSTS WHICH MAY BE DICTATED BY A SPECIFIC MUNICIPALITY AND ARE UNKNOWN AT THIS TIME --- ARE NOT PROJECTED IN THE COST ANALYSIS.

NOTE: INCLUDED IN THIS PRICING ESTIMATE IS THE COST FOR WIND SHEER CALCULATIONS AND CONSTRUCTION --- AS PER THE STATE OF CONNECTICUT BUILDING CODES. THESE COSTS WILL BE MODIFIED UPON FINAL DETERMINATION.

APPLIANCES: THOSE APPLIANCES PURCHASED AS PART OF A CONTRACT WITH CMI WILL BE INSTALLED. ANY OTHER APPLIANCES PURCHASED BY THE OWNER MUST BE INSTALLED BY THE OWNER'S VENDOR.


   

Home || Cost Analysis || Gallery of Homes || Specifications || Customization || Meet CMI || FAQs || Commercial || Mortgage Financing || Products Used || Contact CMI

1-203-312-0288    email: info@cmi-building.com

Copyright © 2006-2015 CMI Building, Inc. All rights reserved, USA and worldwide.
DISCLAIMER: All information contained herein was obtained from sources deemed to be accurate and authoritative. However, no warranty is made to its accuracy, and this information is presented subject to change without notice. A prospective purchaser is encouraged to verify all information.
DISCLAIMER (2): All floorplans and exterior renderings are artists conceptions only. All dimensions are approximate. CMI reserves the right to modify all plans and specifications without notice